Install a charging station for your electric car.
Install a charging station for your electric car.

Fast, convenient charging at home
Why a charging station

11 to 22 kW: up to 3 times faster than a T23 or CEE socket.

Scheduling on the low tariff, badge access. Reimbursement with Voltaback.

Ideal if you drive a lot or charge several vehicles.
Want to install a charging station (wallbox) at home or in a condominium? Here are the essentials: which power to choose, what it costs, the installation rules, the subsidies available in 2026, and how to get reimbursed if it is a company car.
Which power to choose: 11 or 22 kW?
In Switzerland, an 11 kW three-phase charging station is the usual choice: it charges most vehicles overnight, and network operators' rules generally limit the power connected on a single phase. 22 kW is only useful for high-mileage drivers or several vehicles, but be careful: your car often limits the power it accepts on AC (many cap at 7 or 11 kW).
How much does an installed charging station cost?
Expect around CHF 3'000 for an installed charging station in the best case, more in a condominium or if the grid connection needs upgrading. In a shared garage, simply preparing one parking space usually costs CHF 500 to 1'500.
Installation: licensed installer, NIV/OIBT and NIN/NIBT
In Switzerland, every fixed electrical installation is carried out by a licensed electrical installer, in line with the Low-Voltage Installation Ordinance (NIV/OIBT) and the NIN/NIBT standard. Before the work, the installer files an installation notice and a technical connection request with the network operator; work starts once approved. Several charging points, or more than 22 kVA in total, usually require load management. At the end, the installer hands over a safety certificate (SiNa/RS) with the measurements and the test report.
Smart charging station: scheduling, load management, low tariff
Most charging stations can be controlled from an app: scheduling charging on the low tariff, tracking consumption, badge access. Dynamic load management adjusts the power to your installation to avoid tripping the breaker, often without having to upgrade the grid connection.
Charging station or T23 / CEE socket: which to choose?
It all depends on how you use your car:
T23 or CEE socket | Charging station (wallbox) | |
|---|---|---|
Power | 3.7 kW | 11 to 22 kW |
Range added per hour | 20 to 40 km | 40 to 110 km |
Installation | Licensed installer | Licensed installer |
Installed price | On quote, much cheaper | Around CHF 3'000 and up |
Ideal for | Everyday use | High-mileage drivers, fleets, condominiums |
Not sure which to choose? Take the test to find the right solution for you. And if you do not drive much, a T23 or CEE socket is often enough and much cheaper.
Installing a charging station in a condominium
In a condominium (StWE/PPE), there is no right to a charging point: a charging station is a construction measure, generally considered useful, that requires a double majority of the co-owners, by headcount and by ownership share (Art. 647d Swiss Civil Code), unless the condominium regulations say otherwise. A simple majority is enough to commission a feasibility study. Renting? You need the landlord's written consent (Art. 260a Code of Obligations).
Two approaches: an individual installation (your charging station, your line) or a shared infrastructure with load management, which prepares the whole garage step by step. SwissEnergy publishes a practical guide for condominiums, and several cantons subsidise the pre-equipment of shared car parks.
Which subsidies in 2026?
- Cantonal programmes: Zurich pays CHF 500 per parking space (CHF 300 from the 16th) for basic infrastructure in residential buildings, until the end of 2026 and within a budget that is already largely committed; Ticino CHF 500 per charging station (CHF 4'000 for bidirectional); Lucerne CHF 350 per space in multi-family buildings.
- Geneva: subsidies for the pre-equipment of car parks in multi-family housing, extended in October 2025 to individual charging stations.
- Municipal support: some municipalities and network operators add to these programmes. Check with your canton and your municipality before the work starts.
- No federal support: the Confederation subsidises neither charging stations nor vehicle purchases. VAT of 8.1 % applies to equipment and installation.
Pay less: charge on the low tariff
The price of electricity depends on your municipality and your network operator: a Swiss median of 27.7 ct./kWh in 2026 and, depending on the municipality, from 10.6 to 45.9 ct./kWh in 2027. Most operators offer a low tariff at night and at weekends, with their own time slots. Schedule charging from the charging station's app to hit your low tariff. Well managed, home charging costs 2 to 3 times less than public fast charging.
How do you get reimbursed for charging a company car?
If you charge a company car at home, the electricity comes out of your own pocket. The right reimbursement method is real cost, calculated from your electricity tariffs (high tariff, low tariff, solar…), rather than a flat rate capped at CHF 60 a month. That is what Voltaback does: 100 % software, no hardware to install, documentation compliant with the salary certificate (Lohnausweis) and automatic reimbursement, accurate to the cent. See how it works for drivers or across a company fleet.
FAQ
Your questions about charging stations
An 11 kW three-phase charging station is enough for most households and charges most vehicles overnight. 22 kW is only worthwhile for high-mileage drivers or several vehicles. Your installer checks what your network operator allows.
Rarely. On AC, most vehicles only accept 7 to 11 kW. A 22 kW charging station only speeds up charging if both your car AND your three-phase installation allow it. Check your model's AC charging power before oversizing.
Yes. Both 11 and 22 kW require a three-phase connection. On single phase, power is limited and network operators usually cap charging on one phase: your installer checks what is allowed when filing the technical connection request.
Yes. In Switzerland, every fixed electrical installation is carried out by a licensed electrical installer, in line with the NIV/OIBT and the NIN/NIBT. The installer notifies the network operator of the work and hands over a safety certificate when the job is done.
Expect around CHF 3'000 in the best case, more in a condominium or if the grid connection needs upgrading.
On an 11 kW charging station, around 4 to 5 hours for an average battery (50 kWh), if your car accepts 11 kW. Limited to 7 kW, it takes around 6 to 8 hours, so one night.
Yes, with the agreement of the co-owners. There is no right to a charging point in Switzerland: a charging station usually requires a double majority of the co-owners (by headcount and by ownership share), unless the regulations say otherwise. Several cantons subsidise the pre-equipment of shared car parks.
Often, yes. Dynamic load management temporarily reduces the charging power when your home is drawing power, which prevents the breaker from tripping and, in many cases, avoids having to upgrade the grid connection.
Yes, a wallbox can be removed and reinstalled. Have an electrician remove and refit it safely.
No federal support, but cantonal and municipal programmes: for example CHF 500 per parking space in Zurich (until the end of 2026), CHF 500 per charging station in Ticino, CHF 350 per space in multi-family buildings in Lucerne, and Geneva for the pre-equipment of shared car parks. Conditions change often: check before the work starts.