Charging your electric car from a socket: price and installation.
Charging your electric car from a socket: price and installation.

The right compromise for charging at home
Why a dedicated socket

3.7 kW, i.e. 20 to 40 km of range added per hour of charging.

Designed for charging every day, with a dedicated circuit breaker.

Ideal if you do not need the power of a 7 kW charger.
Want to charge your electric car from a socket at home, in Luxembourg or across the border? Here is what matters: the pitfalls to avoid, the price ranges, who to trust with the installation, the grants in 2026, and how to get reimbursed if it is a company car.
The household socket trap: why charging tops out at around 2 kW
On a standard household socket, the Mode 2 cable's control box limits charging to 8 or 10 A, i.e. 1.8 to 2.3 kW, to prevent overheating. To reach 3.7 kW (16 A), you need a dedicated socket: an industrial CEE 16 A socket (blue) on a dedicated circuit, and a Mode 2 cable with a CEE plug or interchangeable adapters.
Cross-border worker living in France or Belgium? The reinforced charging sockets sold in your country (Green'Up type) play the same role, with a cable stated as compatible. In every case, the right charging cable (Mode 2, Type 2) is what gets you the 3.7 kW.
What it costs: price ranges
For a dedicated socket fitted by an electrician, with its circuit and protection devices, budget around €400 to €710 in total. Beware of cheap sockets and adapters sold online: they are often dangerous counterfeits.
Item | Indicative price |
|---|---|
Dedicated socket + circuit breaker (kit) | €150 to €180 |
Socket only | €60 to €90 |
Installation by an approved electrician | €150 to €300 |
Total installed | €400 to €710 |
Have the socket fitted by an approved electrician, especially if you are not confident with electrics.
Installation: dedicated circuit, cable cross-section and safety
A charging socket needs a dedicated circuit run from the consumer unit, protected by a dedicated circuit breaker and a residual current device suited to the DC leakage currents of electric vehicles (type B, or type A combined with DC fault detection). The approved electrician sizes the whole installation. The cable cross-section depends on the distance: beyond 15 m in 2.5 mm², the voltage drops and charging slows down.
Distance to the consumer unit | Cable cross-section |
|---|---|
Up to 15 m | 2.5 mm² |
15 to 25 m | 4 mm² |
More than 25 m | 6 mm² |
Mistakes to avoid
- Buying a cheap counterfeit socket or adapter: risk of overheating and fire.
- Charging with the cable coiled up: the loop creates a hot spot.
- Connecting to an existing circuit instead of a dedicated one.
- Forgetting the residual current device suited to electric vehicles.
- Undersizing the cable cross-section for the distance.
- Leaving the socket housing unfixed to the wall.
Dedicated socket or charging station: which to choose?
It all depends on how you use it:
Standard socket | Dedicated socket | Charging station (wallbox) | |
|---|---|---|---|
Power | 2.3 kW | 3.7 kW | 7 to 22 kW |
Range added per hour | 10 to 15 km | 20 to 40 km | 40 to 110 km |
Installed price | €0 (already there) | €400 to €710 | €1,000 to €2,000 |
Ideal for | Occasional top-up | Daily use | High-mileage drivers, fleets |
To go further, compare the socket and the charging station on our charger installation page.
Approved electrician or specialist installer: which to choose?
Using a specialist charging installer | Using a local approved electrician |
|---|---|
Pros: reference equipment, clear quote, knows the grid procedures, product warranty. | Pros: close by, often cheaper, flexible, knows your home. |
Cons: often more expensive, and frequently steers you towards a charging station when a dedicated socket is enough in many cases. | Cons: variable quality, check that they are approved and ask for a detailed invoice. |
Cross-border workers: in France, Belgium or Germany, the installation rules and grants of your country of residence apply. Use a qualified electrician near you.
Pay less: night tariff and reference power
In Luxembourg, there is no regulated off-peak tariff. Some suppliers offer a night tariff or a dynamic tariff, which follows the wholesale price hour by hour and requires a Smarty meter.
Schedule charging according to your actual tariff, not a fixed time slot. Well managed, charging at home costs much less than at a public charging station.
Since 2025, the grid tariff depends on a reference power assigned by Creos. A 3.7 kW socket used at the same time as large appliances can exceed it and trigger a surcharge: start charging at night, when the home uses little power. If you charge a company car, this extra cost can be included in your reimbursement thanks to Voltaback.
What grants are available in 2026?
What you need to know in 2026:
- VAT: 17 % on the socket and installation. The 8 % rate applies to electricity, not to the installation.
- Charger grant (draft): draft bill no. 8577, not yet voted, covers new chargers above 3.7 kW. A charging socket is not eligible.
- No grid request: up to 4.6 kW on single-phase, no prior request to the grid operator.
- Cross-border workers: any grants are those of your country of residence.
How do you get reimbursed for charging a company car?
If you charge a company car at home, the electricity comes out of your pocket, but it powers the company's car: your employer can reimburse it.
The right method is reimbursement at real cost, calculated at the price of your electricity contract, in Luxembourg or in your country of residence if you are a cross-border worker. If your company does not have a scheme yet, talk to your HR, fleet management or finance department.
Solutions like Voltaback measure every home charging session and generate a record per vehicle for automatic reimbursement, accurate to the cent, with no hardware to install and nothing to pay upfront. See how it works for drivers.
Warning signs and lifespan
A charging socket lasts 5 to 8 years on average. Have it checked by a professional if you notice any of these signs:
- The socket is warm or hot to the touch after charging.
- Charging gradually slows down (from 16 A to 12 or 10 A).
- Discolouration or blackening appears around the pins.
- The circuit breaker trips for no apparent reason.
Dedicated socket, charging station or wallbox: power comparison
To equip a fleet driver at home, there are three options. The dedicated socket is the best cost/speed compromise in most cases. Here are the 2026 benchmarks, at full power and excluding charging losses (8 to 15 %).
Solution | Power | Current | Charging 50 kWh | Range added | Recommended use |
|---|---|---|---|---|---|
Household socket | 2.3 kW | 10 A | about 22 h | about 12 km/h | Occasional top-up |
Dedicated socket | 3.7 kW | 16 A | about 14 h | about 20 km/h | Daily home charging |
Single-phase wallbox | 7.4 kW | 32 A | about 7 h | about 40 km/h | High-mileage driver, fast charging |
Three-phase wallbox | 11 kW | 16 A (three-phase) | about 4 h 30 | about 60 km/h | Intensive charging |
Charging time by battery capacity
On a 3.7 kW dedicated socket, one night is enough to cover most daily journeys. Indicative benchmarks, at full power:
Battery | 3.7 kW dedicated socket | 7.4 kW wallbox | 11 kW wallbox |
|---|---|---|---|
40 kWh | about 11 h | about 5 h 30 | about 3 h 30 |
60 kWh | about 16 h | about 8 h | about 5 h 30 |
80 kWh | about 22 h | about 11 h | about 7 h 30 |
In Luxembourg, VAT on installing a home charging socket is 17 %. Safety point: an extension lead or multi-socket adapter must never be used for charging, as it creates a risk of overheating; you need a dedicated circuit.
If your company car belongs to a fleet, the dedicated socket is often still the best choice: lower equipment cost and consumption tracking possible even without a connected charger. For reimbursement, talk to your HR or fleet management department. Solutions like Voltaback produce a record per vehicle at real cost, including without a smart meter. Talk to a Voltaback expert.

Typical installation of a 3.7 kW charging socket on a dedicated circuit.
FAQ
Your questions about charging from a socket
A dedicated charging socket, for example an industrial CEE 16 A socket on a dedicated circuit, delivers 3.7 kW at 16 amps, about 60 % more than a household socket. It lets you charge your electric car safely every day, without installing a charging station.
About 20 to 40 km of range added per hour of charging. Plugged in overnight, it charges most vehicles for the day ahead.
A dedicated socket is enough for most daily use. A wallbox (7 kW and above) is only useful if you drive a lot or charge several vehicles. Above 4.6 kW on single-phase, it also requires a request to the grid operator.
Yes, it is strongly recommended: a charging socket needs a dedicated circuit, a suitable circuit breaker and residual current device. An approved electrician guarantees a safe, compliant installation. However, up to 4.6 kW on single-phase, no prior request to Creos is needed.
The one that matches the rules of your country of residence. In France or Belgium, Green'Up type reinforced charging sockets are common; in Germany, a CEE socket or a wallbox is more usual. Voltaback reimburses charging at the price of your local contract, whatever the socket.
It can if large appliances are running at the same time, with a surcharge on the kWh concerned. The solution: schedule charging at night, when the home uses little power.
The socket alone costs €60 to €90. Fitted by an approved electrician, with the dedicated circuit and protection devices, budget around €400 to €710 depending on your home's configuration.
Draft bill no. 8577, not yet voted, covers chargers above 3.7 kW: a charging socket is not eligible. VAT on the socket and installation is 17 %. Cross-border workers: grants are those of your country of residence.
It is not advisable without electrical skills: the dedicated circuit, the suitable circuit breaker and residual current device are essential for safety. Use an approved electrician.
5 to 8 years on average with daily use. Have it checked if you notice overheating, burn marks or repeated cut-outs while charging.