EV charging subsidies for businesses in Switzerland (2026): what cantons and communes really pay
EV charging subsidies for Swiss businesses in 2026: no federal grant, programmes in BS, TI, GE, VD and ZH, depreciation, VAT and the case without grants.
Aubin Aycaguer, Chief of Staff, Voltaback9 Nov 2026

There is no federal subsidy for company car charging in Switzerland: support comes from cantons, municipalities (communes / Gemeinden) and some electricity utilities, and the programmes change often. The only federal scheme funds depot charging for electric trucks. Most cantonal programmes target residential buildings; few cover company car parks.
If you arrive from a country with national grants, this is the main surprise. This article sets out, canton by canton, what applies in November 2026, with conditions and links to official pages: Basel-Stadt, Ticino, Geneva, Vaud and Zurich. It also covers the federal truck programme, what a charge point costs before any grant, how to apply without losing the money, tax (depreciation, input VAT), employee cases and how to build a business case without any grant. At Voltaback, home charging software for fleets, we see the same pattern with many clients: the biggest lever is not the subsidy but the right number of charge points.
Key points in 30 seconds
- Confederation: no grants for vehicles or for company charging stations.
- Open to companies: mainly Basel-Stadt (basic infrastructure) and Ticino (chargers for staff); Vaud was in 2025.
- Geneva: residential buildings only.
- Zurich: the CHF 50 million programme, which also funded about 200 company sites and fleets, has been fully used since October 2026.
- Electric trucks: a federal programme of CHF 20 million (2026 to 2030) funds up to 40 % of depot charging for SMEs.
- Almost everywhere: apply before work starts, or you lose the grant.
- Tax: charging infrastructure is depreciated and the 8.1 % VAT is recoverable as input tax.
Why there is no federal grant
Switzerland has neither a federal purchase bonus for electric cars nor a federal contribution to company charging stations. The Confederation focuses on information and coordination, for example through the LadenPunkt programme of SwissEnergy (EnergieSchweiz), which offers guides and planning tools.
Since 1 January 2024, electric cars are also no longer exempt from the 4 % automobile tax (Automobilsteuer). Source: Federal Office for Customs and Border Security, automobile tax.
Energy policy for buildings is a cantonal matter. So the cantons fund charging infrastructure, usually through their energy subsidy programmes, with very different priorities.
The exception: depot charging for electric trucks
One federal programme does exist, but for heavy vehicles. From 2026 to 2030 the Confederation provides CHF 20 million to help small and medium-sized companies install charging for electric trucks at their own sites:
- Who: SMEs with fewer than 250 employees;
- What: planning, grid connection, cabling and charging equipment for depot charging;
- How much: up to 40 % of the costs per company;
- Who runs it: the Swiss Commercial Vehicle Association (ASTAG) with the consultancy EBP; applications have been open since 1 January 2026.
It does not cover company cars or light vans. For a logistics or construction company electrifying its trucks, though, it is the most substantial grant available in Switzerland. Source: electrive.com, 30.10.2025.
How expats should read the Swiss landscape
If you have run fleets in Germany, the Netherlands or the UK, three reflexes do not work here. There is no national register of grants to check once: each site's canton and municipality must be checked separately. Grants are budget-limited and close early when the money runs out, as Zurich showed in 2026. And grants mostly go to the owner of the building, so a company renting its offices usually depends on its landlord applying.
Cantonal programmes in 2026 at a glance
Canton | Programme | For companies? | Amount | Status |
|---|---|---|---|---|
Basel-Stadt | Aktion Ladeinfrastruktur | Yes, individuals and legal entities | 60 % of costs, max. CHF 1'300.– per point (private) | Runs until end 2030 |
Ticino | Incentivi mobilità elettrica | Yes, chargers for staff | CHF 500.– to 4'000.– per charger | Open, CHF 11 m credit |
Geneva | Pre-equipment of car parks | No, buildings with 5+ dwellings | CHF 250.– to 500.– per space, CHF 1'000.– per charger | Open |
Vaud | Recharge privée | Yes, buildings built before 2021 | 50 % of costs, chargers excluded | 2026 terms not confirmed |
Zurich | Förderprogramm Ladeinfrastruktur | Yes, company sites and fleets too | CHF 500.– per residential space; up to CHF 30'000.– per company | Fully used since October 2026 |
Details follow. All amounts can change: check the current status before each project.
Basel-Stadt: the most generous scheme for company car parks
Through its "Aktion Ladeinfrastruktur", Basel-Stadt funds the basic infrastructure of car parks. Both individuals and legal entities may apply, so a company that owns its site qualifies.
- Rate: 60 % of eligible costs, VAT included.
- Cap per charge point: CHF 1'300.– in a private car park, CHF 3'500.– in a publicly accessible one, CHF 7'500.– at a car-sharing location.
- Conditions: at least level C1 under the SIA 2060 bulletin, a separate meter for charging electricity, work by certified professionals. Charging stations themselves are not funded.
- Duration: July 2024 to end 2030.
For a company with 20 spaces in a private underground car park, that can mean up to CHF 26'000.– for the basic infrastructure if costs are high enough.
Worked example: a Basel company owns a 20-space underground car park and brings it to level C1, with a separate meter, for CHF 50'000.– of eligible basic infrastructure. 60 % would be CHF 30'000.–, but the cap of CHF 1'300.– per point limits the grant to CHF 26'000.–. It then installs 6 wallboxes for pool cars and visitors at about CHF 1'500.– each, CHF 9'000.– not funded.
Net investment: CHF 50'000.– + 9'000.– − 26'000.– = CHF 33'000.–, depreciated over the following years. The 14 other spaces are ready for a charger whenever demand appears, at the cost of the device and a short connection. Basel-Stadt also supports EV purchases by businesses through its "Wirtschaft unter Strom" campaign.
Sources: Canton of Basel-Stadt, Aktion Ladeinfrastruktur, Canton of Basel-Stadt, electromobility.
Ticino: flat amounts for chargers at the workplace
Ticino has a CHF 11 million framework credit for electric mobility. Its implementing decree of 8 March 2023 provides flat amounts for chargers at home and at employers:
- CHF 500.– per single or double charger without load management;
- CHF 1'200.– per charger in an installation with central dynamic load management (SIA 2060 level D);
- CHF 4'000.– per bidirectional charger.
Employers qualify only if the charger is for their staff, and the company must have its registered office in Ticino; minimum power 3.7 kW. For installations with load management, apply before work starts; single chargers can be claimed within 30 days of the invoice.
Source: Canton of Ticino, implementing decree of 8.3.2023. The canton amended the scheme by decree in 2026, so check the current amounts and the remaining credit on its portal before ordering: Canton of Ticino, electric mobility (Italian). Since Zurich's programme closed, Ticino is also the only canton reviewed with an open grant for bidirectional chargers, useful if your fleet wants to test vehicle-to-grid at home or at work.
Geneva: residential only
Geneva subsidises the pre-equipment of shared car parks in residential buildings with at least 5 dwellings and a building permit dated before 2023: CHF 500.– per space for spaces 1 to 10, CHF 300.– for spaces 11 to 30, CHF 250.– beyond, capped at 50 % of costs and CHF 20'000.– per car park. On top, up to CHF 1'000.– per individual charger. Central load management is mandatory.
Company car parks are not eligible. Your employees living in a Geneva apartment block, however, can use it to equip their space. Source: Canton of Geneva.
Vaud: companies included in 2025, 2026 still open
Vaud's 2025 "private charging infrastructure" programme covered residential buildings and companies in buildings built before 2021. Conditions: at least 3 spaces equipped to level C1 or C2, central load management, a 100 % renewable electricity contract, and an application before any work. It funded the electrical infrastructure, not the chargers.
We could not confirm whether the programme continues in 2026 on the same terms. Ask the cantonal Directorate of Energy (DGE-DIREN) before signing a quote. Source: Canton of Vaud, 2025 form.
Zurich: programme exhausted
Zurich's charging infrastructure programme (CHF 50 million, April 2023 to October 2026) is fully committed. New applications are no longer accepted; pending ones go on a waiting list. Only the "Die Ladestation im Quartier" measure for municipalities remains (30 % of costs, max. CHF 3'000.– per space).
The programme was not only residential. Of more than 8'000 applications covering over 114'000 parking spaces, about 95 % of the money went to houses and apartment buildings, but nearly 200 companies received up to CHF 30'000.– each for company premises and fleets. Private and commercial applications are no longer accepted; public charging continues to be funded through the general energy programme. Source: electrive.net, 30.10.2026 (German).
Source: Canton of Zurich.
Zug and the other cantons
Zug, Bern, Aargau, Lucerne, St. Gallen and other cantons run energy subsidy programmes in which charging sometimes appears, often for apartment buildings. Lucerne, for example, has paid CHF 350.– per space (1 to 10 spaces) in multi-family buildings in 2026. Amounts and conditions change every year. The cantonal energy office gives the binding answer.
Many cantonal programmes also exclude companies that are exempt from the CO2 levy: Bern states this explicitly in its general funding conditions. Check this point first if your company has a CO2 reduction agreement with the Confederation. Source: Canton of Bern, energy funding programme (German).
Municipalities and utilities
Beyond the cantons, some cities fund charging through their municipal energy funds, and some utilities offer their own schemes: contributions to basic infrastructure, discounted charging solutions or advice.
These offers are local and change often. Ask your municipality and your network operator, for example ewz, EKZ, WWZ, IWB or SIG, before you sign.
The quickest way to see everything at once is Energiefranken, the search platform of SwissEnergy: you enter the postcode of the building and get the federal, cantonal and municipal programmes, as well as offers from energy suppliers and other funders, that apply there. Search once per site. Source: Energiefranken.
Can grants be combined?
Sometimes. Some programmes deduct other public contributions from their own, others cap the total public funding at a share of costs, and some exclude any double funding. Three rules of thumb:
- declare every other grant in each application, even if you are not asked twice;
- never invoice the same cost to two programmes;
- keep all invoices and payment proofs for several years, because programmes can audit after payment.
What a charge point costs before any grant
Grants cover a share of costs, so start from the full price. Orders of magnitude for Switzerland, to be replaced by real quotes:
Item | Order of magnitude | Typical grant in 2026 |
|---|---|---|
Preparing one space in an existing garage (conduit, cable route) | CHF 500.– to 1'500.– per space | Basel-Stadt 60 % of basic infrastructure; residential programmes elsewhere |
Basic wallbox at an employee's house, installed | CHF 1'000.– to 3'500.– | Ticino CHF 500.–; Geneva up to CHF 1'000.– in collective residential car parks |
Connected wallbox at home, installed | About CHF 3'000.– in the best case | As above |
AC charge point in a company car park, installed | Around CHF 3'500.– | Basel-Stadt (basic infrastructure only), Ticino CHF 1'200.– with load management |
Bidirectional charger | Several thousand francs more than an AC wallbox | Ticino CHF 4'000.– |
Sources: SFOE / SwissEnergy guide to charging in condominiums (German) for preparation costs; Zürcher Wirtschaft for the CHF 3'000.– home installation. Grid connection upgrades, a new distribution board or civil works can double a car park budget, so ask the installer to quote them separately.
How to apply without losing the grant
Most grants are lost on procedure, not on eligibility. A seven-step sequence that works in most cantons:
- Check the programme for each site, by postcode, before asking for quotes.
- Read the technical conditions: SIA 2060 level, load management, separate meter, renewable electricity contract, minimum power.
- Get quotes from licensed installers that meet those conditions, with the eligible costs shown separately.
- File the application before any work, and before signing an order where the programme says so.
- Wait for the written commitment. Starting work on the strength of an acknowledgement of receipt is the classic mistake.
- Carry out the work within the deadline set in the commitment, with the installer's safety certificate at the end.
- Claim payment with invoices, payment proofs, photos and the commissioning report.
Allow several weeks between application and commitment. In programmes close to exhaustion, a complete file filed early is worth more than a perfect one filed late.
Five mistakes that cost the grant
- Signing the installer's order first, then applying: most programmes refuse work already started or ordered.
- Applying for the wrong site owner: in a rented building the grant usually goes to the owner, and the application must come from them.
- Missing a technical condition: no separate meter, no load management, the wrong SIA 2060 level, or no renewable electricity contract where required.
- Mixing eligible and non-eligible costs in one invoice line, so the programme cannot identify what it funds.
- Waiting for next year's budget in a programme close to exhaustion: Zurich closed two months before its official end date.
Tax: depreciation and input VAT
Even without a grant, the tax system shares part of the cost.
Depreciation under ESTV leaflet A 1995
Charging infrastructure is a fixed asset and is depreciated. The Federal Tax Administration's leaflet A 1995 (Merkblatt A 1995) has no specific category for chargers. The classification depends on whether the installation is part of the building or a separate fixture:
Possible category | Standard rate (declining balance, on book value) |
|---|---|
Commercial and office buildings (building only) | 4 % |
Industrial and trade buildings (building only) | 8 % |
Business furniture, fixtures of a furniture nature | 25 % |
Production equipment and machinery | 30 % |
Automatic control systems | 40 % |
For straight-line depreciation on acquisition cost, the rates are halved. Built-in basic infrastructure (cables, busbar) tends to follow the building; a wallbox tends to be treated as equipment. Confirm the classification with your cantonal tax office.
Source: ESTV, leaflet A 1995 (German version published by the Canton of Schwyz).
For depreciation of the vehicles themselves, see our article on company vehicle depreciation.
VAT
VAT-registered companies recover the 8.1 % VAT (MWST / TVA) on hardware and installation as input tax, to the extent the installation is used for business. On a CHF 50'000.– quote excluding VAT, that is CHF 4'050.–.
Beyond charging grants: the incentives that remain
For electric cars themselves, the Swiss incentives that still matter in 2026 are cantonal tax rules, not grants. Each canton sets its own vehicle tax (Motorfahrzeugsteuer / impôt sur les véhicules), and the trend is to phase out EV exemptions:
Canton | Treatment of battery-electric cars |
|---|---|
Zurich | Exempt from the annual vehicle tax |
Bern | 60 % reduction for the year of first registration and the following three years |
Vaud | Ordinary scale reduced by 90 % (as reported) |
Ticino | Formula based on weight and power with a lower coefficient for EVs, no full exemption |
St. Gallen | New weight and power tax since 2026: EVs now pay |
Sources: Canton of Zurich (German), Canton of Bern (German), Canton of St. Gallen (German).
For a fleet registered in Zurich, the vehicle tax saving over a car's life can be worth more than any charging grant. Register vehicles in the canton of the company that holds them, and check the rules before moving a fleet between entities.
Two cases involving employees
Free charging of an employee's own EV at work
For a company car, electricity at work is covered by the 0.9 % monthly private-use share. For an employee's own EV there is no explicit rule: the salary certificate (Lohnausweis / certificat de salaire) guidelines list free workplace parking among benefits that need not be declared (Rz 72), but not charging.
In principle, therefore, treat it as a taxable benefit. Clarify the practice with your seat canton before offering free charging as a perk. Source: ESTV, salary certificate guidelines 2026.
A wallbox at the employee's home
If the company pays for a wallbox that becomes the employee's property, tax advisers treat it as a taxable benefit in kind to be declared on the salary certificate. If the wallbox remains company property and is taken back when the employee leaves, practice treats it more like a work tool; we found no official confirmation of this.
Cantonal practice varies widely. In a survey of cantonal tax administrations published by BDO Switzerland in February 2025, most cantons tax an employer-paid wallbox in full, under item 2.3 of the salary certificate; Obwalden treats half of it as private; Lucerne allows a one-off CHF 1'500.– exemption; and Zug taxes nothing when the employer pays the whole cost. Lucerne and Zug claw back part of the benefit if the employee leaves within 12 months. Source: BDO Switzerland (German).
A cantonal grant for a home charger goes to the owner of the property, not to the employer. It does not change the tax question of who paid for the wallbox.
Source: aboutFLEET, tax obstacles to e-mobility.
In a condominium (Stockwerkeigentum / PPE), the owners' association decides: a charger counts as a useful construction measure requiring a majority of co-owners who also hold a majority of shares (Art. 647d of the Civil Code, ZGB). Change is coming for tenants and co-owners: motion 23.3936 was adopted in June 2025, and the consultation on the amendment to the Energy Act ran until 12 October 2026. Source: Federal Office of Justice.
For the cost of a home installation, see our article on home charger installation prices.
Building the business case without subsidies
For a fleet of cars and light vans, accept it up front: the business case must work without grants. Even in Basel-Stadt the subsidy covers only part of the basic infrastructure, never the chargers. And most programmes target residential buildings.
It all starts with one question: where do your vehicles sleep?
Vehicle profile | Where it charges | Support still open in 2026 |
|---|---|---|
Company car, driver in a house | Overnight, at home | Nothing for the company; depending on canton, for the owner |
Company car, driver in an apartment block | In their own parking space | GE and other cantons for basic infrastructure |
Pool or service vehicle | In the company car park | BS, TI, VD (2025); otherwise depreciation and input VAT |
Which project, which support?
Project | Support to look for | What really pays for it |
|---|---|---|
New head office | Cantonal building rules may require readiness; grants rarely | Building budget, depreciation, input VAT |
Existing company car park, owned | Basel-Stadt, Ticino; municipal funds via Energiefranken | Depreciation, input VAT, right-sizing |
Existing company car park, rented | Landlord's application, if any | Lease negotiation |
Electric truck depot | Federal ASTAG programme, up to 40 % | Grant plus depreciation |
Employees' homes | Residential programmes for the owner (GE, LU, TI...) | Reimbursement of home charging at actual cost |
Four in five Swiss EV drivers charge where they live; barely 30 % charge occasionally at work. Source: TCS, 04.11.2025.
Example: 50 company cars in Zurich
A Zurich company has 50 electric company cars that spend the night at employees' homes. It is considering 25 AC points at head office. At around CHF 3'500.– per installed point, that is CHF 87'500.–, with no cantonal grant now that the Zurich programme is exhausted.
Those 25 points do not replace home charging: the cars are not in the car park at night. With 3 points for pool cars and visitors, the investment falls to CHF 10'500.–, a CHF 77'000.– difference on installation alone, before back-office and maintenance. The full five-year calculation is in our guide to installing workplace EV charging.
That money works harder in home charging: a suitable installation per vehicle and reimbursement at actual cost. Why a connected wallbox is not required: see our comparison of connected chargers for employees. If your municipality requires parking spaces to be prepared, the details are in our article on workplace charging obligations.
Tip: the charging installation simulator shows, vehicle by vehicle, which home installation is enough.
Looking ahead to 2027
Three developments will shape support for company charging over the next two years:
- Zurich has moved its money to public charging. The framework credit approved by the cantonal parliament in August 2026 funds charging for residents without a private space, through municipalities. Company sites should not expect a new private programme soon.
- The right to charge may shift costs to building owners. If the Energy Act amendment passes, owners of residential buildings could have to build basic infrastructure on request. Cantons may then adapt their residential grants. It will not change much for company car parks.
- Cantonal energy laws are being rewritten to adopt the 2025 model regulations (MuKEn 2025). Where a canton makes charging readiness compulsory in new buildings, grants for that readiness usually disappear, since a legal duty is not subsidised. Geneva already works this way: its pre-equipment grant only targets car parks whose building permit predates 2023, because newer buildings must be pre-equipped anyway.
For multi-site groups, one more point: grant budgets are usually set per calendar year and per canton. If several of your sites qualify, file all applications at the start of the year rather than one after the other, and keep a simple register per site with the programme, the application date, the commitment and the payment.
The practical conclusion for a fleet budget: plan charging as an investment that stands on its own, and treat any grant as a bonus to apply for, not as a condition of the project.
Checklist before you ask for quotes
- How many of your vehicles actually sleep at the company site?
- Who owns each site, and who can apply for a grant?
- Which programmes apply by postcode, and are they still open?
- Which technical conditions (level, meter, load management) do they impose?
- Is your company exempt from the CO2 levy, which can exclude it?
- How will employees' private cars be billed if they use the chargers?
What Voltaback changes in practice
Without grants, every franc spent on charging has to be justified. Voltaback does not install chargers: the platform measures all of your fleet's charging (home, site, on the road) and reimburses home charging at actual cost, whatever hardware the driver has.
- No connected hardware to fund: 100 % software, more than 48 car brands connected. A suitable electrical installation at home is still needed, chosen to fit real needs.
- Measurement: Voltaback relies on the home's MID-certified meter, not on a standalone cable meter; 1.22 % relative error, audited by Bureau Veritas.
- Real tariff: each kWh is valued at the employee's own contract (peak and off-peak, solar, self-consumption groups), not at an average.
- Data protection: ISO 27001 since 2 December 2025, compliant with the nDSG / nLPD; the company never receives drivers' location data.
- Telematics without a box: mileage, consumption, eco-driving, alerts and maintenance.
- Quotes: for the charge points you really need, use our installer quote service.
More than 200 companies, including major European groups, already reimburse their drivers' home charging with Voltaback. Companies such as Sodexo, Siemens, BNP Paribas and Sanofi use Voltaback.

Frequently asked questions about EV charging subsidies in Switzerland
No, the Confederation pays no grants for company charging stations or for buying electric cars. Support is cantonal and municipal only. Basel-Stadt and Ticino are among the few cantons that explicitly include companies.
Not any more for new applications: the cantonal charging infrastructure programme, which funded homes and about 200 company sites, has been fully committed since October 2026. Applications on the waiting list may still be served if funds are freed; otherwise only a measure for municipalities remains. Check your municipality and your utility, such as ewz or EKZ, for local offers.
There is no federal purchase bonus, and since 2024 electric cars pay the 4 % automobile tax. Some cantons reduce or waive the cantonal vehicle tax, Zurich for example exempts battery-electric cars. Some cantons, such as Basel-Stadt and Ticino, also fund charging infrastructure.
Yes, in Ticino, with a flat CHF 4'000.– per bidirectional charger, including at employers if it is for staff. We found no specific bidirectional grant in the other cantons reviewed.
In most programmes, before work starts: Basel-Stadt, Geneva and Vaud all require it. In Ticino this applies to installations with load management, while a single charger can be claimed up to 30 days after the invoice. Starting too early often costs you the grant.
Yes. From 2026 to 2030 a federal programme of CHF 20 million, run by ASTAG with EBP, funds up to 40 % of depot charging costs for SMEs with fewer than 250 employees. It covers trucks, not company cars.
Not if the wallbox becomes the employee's property: tax advisers then treat it as a taxable benefit on the salary certificate. If it stays company property, it is treated more like a work tool. Have the case confirmed by your seat canton.
Take the next step
Subsidies will fund little, if any, of the charge points for your car fleet. Your budget should therefore go where your vehicles actually charge. Book a demo: in 30 minutes you get the real charging cost of your fleet, the right number of points on site and a plan to reimburse home charging without unnecessary hardware.
Recommended articles
Company
Fleet electrification in Switzerland: rules, roadmap and TCO levers
Fleet electrification in Switzerland: no company quota, but CO2 rules, the Climate Act and climate reporting. Roadmap, charging, TCO and CO2 avoided.
Company
Electric car tax in Switzerland: what a company fleet pays in each canton in 2026
Electric car tax in Switzerland in 2026: 4 % automobile tax, cantonal vehicle tax in all 26 cantons, bonuses that expire and a 20-car fleet over 5 years.
Company
Total cost of ownership of an electric company car in Switzerland: EV vs combustion
EV vs petrol company car TCO over 4 years in Switzerland: automobile tax, cantonal tax, home charging at 28 Rp./kWh, 0.9 % private share. Worked in CHF.